Achievement is created at all beginnings where
  it will bring an easy start, during and the ending of every objective of an
  event. Proper arrangements are the integrity of every important event moreover
  a project which involved the oil and gas company, there may be a lot of jobs
  but here, we want you guys to dive into our project in which Barisan Samudera
  Sdn Bhd (BSSB) was involved to make it successful and so does to the rest of
  other crews, as mentioned by Field Superintendent, 
usually, the integrity in the monopoly will end successfully - Mohd. Razi
  As per all projects do so, BSSB have an inappropriate schedule of dates to be
  mobilized but they keep on doing their best to find those who are competent
  for all the tasks assigned to be done as per our client's requirements. 
Some are easy to explain but there's maybe a complaint. - Max Asper.
  On 27/07/2023 BSSB finally managed to get everyone on our line of project.
  After we were done with all the site arrangements where it took 5 days or
  about a week for everyone to be fully ready. Because the Safety Rules of the
  PPTEP(BORF) groups are one of
  ZERO ACCIDENT achievement in all job tasks, which
  means all the worker must declare their valid competency certification before
  proceeding to work.
Why things work safely is how you safely put it to work. - Shariezza (BSSB Site Manager)
  BSSB together with other companies such as
  DESB, HHA ASSOCIATES, VELOSI, TEGAS KOMBINASI, RIA SOLUTION, AIR MARINE,
    INTAJ HOLDING, TRANSWATER API, TRIENEKENS, SINARAN LINOR, DURAGATE, TPS, MAX
    GRIP, PPTEP, and some other group of companies are all required to be on BORF every day
  during the facility is in its Shut Down mode. The job must be completed within
  16 days, with a total of 344 crews from BSSB on the
  BINTULU ONSHORE RECEIVING FACILITY (BORF) site. On the first day of the
  shutdown project events, everyone was assigned to their group, where the group
  leads by those who have experienced and are experts in the shutdown activity,
  most of it is the VESSEL ENTRY for the internal vessel cleaning and also for
  modification, rectification, and inspection.
We may not be the best, but we'll take the test. - Inting (Field Supervisor)
  Here, during this great spot of shutdown job mode, lots of new things shall
  get to be learned by the new workers including details on working hours to be
  the advantages in their new career and another opportunity to gain potential
  in career upgrading during this shutdown seasonal activity availability.
  Advantages that can set their business apart. It all depends on personnel
  determination of which activities and obligations are in the relative field of
  their jobs, the qualifications and experiences necessary for them to perform
  on the job, and the circumstances under which type of work is executed. The
  important point is to familiarize and analyze the job for the worker to be
  assessed during doing the job. 
True knowledge divides no age, it is cultivated from knowing nothing until it becomes understanding. - Edwin
  Every team is required to stick with their group unless there is an instant
  request which requires more manpower for a critical execution or another
  additional activity. No one is allowed to move around the facility without a
  partner(Buddy System), and everyone needs to stay alert every time where they
  have to keep on updating recent and their next activities. Toolbox talk must
  be conducted before any activity begin to ensure everyone will comply with all
  the safety regulations bases on their Job Hazard Analysis(JHA). 
To refer was preferred because if anything we can defer. - Randy Ak Jantie (Scaffolder Inspector)
  The Shut Down activity usually begins and ends up with the activity as
  displayed below, read it to know some about it, not too detailed but it is for
  general knowledge only.
RIGGING & SLINGING ACTIVITY
1. Align, level, and anchor machinery
  2. Attach loads to rigging to provide support or prepare them for moving,
  using hand power tools.
  3. Control movement of heavy equipment through narrow openings or confined
  spaces, using chains falls, gin poles, gallows frames, and other equipment
4. Dismantle and store rigging equipment after use.
  5. Fabricate, set up, and repair rigging, supporting structures, hoists, and
  pulling gear using hand and power tools.
6. Odd bolting Vessel main whole isolation system.
7. Vessel disassemble for the Vessel's internal clean process.
VESSEL CLEANING 
  1. Vessel cleaning and removal of Valves for further Modification and
  Rectification process.
2. Vessel entering and Vessel filters replacement
  3. Heavy Lifting using Mobile Crane for the PROCESS VESSEL internal Cleaning
  and Inspections.
4. Reinstate and assemble the Vessel(Normalize)
5. Pressure test(PRESSURIZE)
6. Start-up BORF
  Let's get things done, for a clear view or to be more specific here is the
  BSSB crews management schedule group, Site Supervisor, Team Leader, Scaffolder
  Team, Vessel Entry Team, Lifting Team, Rigger/General Helper. just for the
  recap back here are all the groups together with their Group Leaders.
who we are, what we are for is for what it made. - Anderson
1) Team A - Inting (Field Supervisor)
43 pax
a. Scaffolder = 6
b. Vessel Operation = 10
c. Rigger/Helper = 26
2) Team B - Max Asper (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
3) Team C - Reggie Ak Suel (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
4) Team D - Anderson (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
5) Team E - Edwin (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
6) Team F - Peter (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
7) Team G - Nicholas (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
8) Team H - Feddy Jimbun (Site Supervisor)
43 pax
a. Scaffolder = 6
  b. Vessel Operation = 10
  c. Rigger/Helper = 26
  This activity description may contradict or not other people's
  knowledge of the platform shutdown, your second reminder is that our
  activity is for the VESSEL CLEANING process not piping replacement or any
  other oil and gas job activities because there are various types in the oil
  and gas facility and it will come in difference activities. That's all, see
  you guys in the next project, BARISAN SAMUDERA is Da Best!!
Take all the best, and thanks for all the bad, it's time to go home for a rest, for all of what we doing our best. - Laila (SHO BSSB)
Don't be cruel over what's crucial, you can change the exception, but not the direction of your execution. Stay safe! - Nabil (SHO BSSB)
As we have done successfully from the project period, here we present our short video to let our readers to see some conner of our gathering which one of our crew managed to create, not a good one yeah, sure it makes us satisfied and will remain as our memory where some of the crew is a newcomer so that they can configure and also to understand what has the expertise revealed for them, as they lessons in their new career journey.
(A Bravo Chain Do Effective. - BSSB)